Building BusinessServices

Section 24

Smart Energy Meter Assembly

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹24.95 lakh and ₹24.95 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Smart Energy Meter Assembly

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹19.23 L
Term loan from bank
₹12.50 L
Promoter’s contribution
₹1.92 L
Subsidy
₹4.81 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.40 L
Average DSCR
-1.35
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Mould meter casings and assemble circuit boards into smart electricity meters.

Main product or serviceSmart Energy Meter Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Power distribution companies (through tenders)
  • Larger meter brands and smart-meter contractors (job work)
  • Housing societies and commercial buildings (sub-metering)
  • Assembling for bigger meter makers
  • Utility tenders after approvals
  • Electrical contractors

05 Plant and machinery

ItemQty₹Total ₹
Injection moulding machine17,00,0007,00,000
Solder paste printer11,00,0001,00,000
Pick-and-place machine11,50,0001,50,000
Single reflow oven190,00090,000
Solder paste inspection (SPI) machine11,65,0001,65,000
Automated optical inspection (AOI) machine14,00,0004,00,000
Temperature-controlled soldering station126,00026,000
Printing machine11,50,0001,50,000
Testing equipment (× LS)150,00050,000
Total18,31,000

Pre-filled from: PMEGP sample project report — Smart Energy Meter (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022 edition. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • PP or PVC plastic granules — for moulding the meter casing
  • Electronic parts: power converter, processor, modem, internal battery, display (LED/LCD), Hall-effect sensor, cover-tamper and tact switches, custom circuit board — the largest cost item
  • Screws, springs, solder wire and paste, flux, battery contacts, connectors, wires — small parts bought in bulk

07 Cost of project

₹ in lakh
Plant and machinery18.31
Contingency0.92
Total fixed capital19.23
Working capital margin0.00
Total project cost19.23

08 Means of finance

₹ in lakh%
Promoter’s contribution1.9210.0
Subsidy4.8125.0
Term loan from bank12.5065.0
Total19.23100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.380.380.380.380.380.380.38
Insurance0.100.100.100.100.100.100.10
Total cost of operations3.363.363.363.363.363.363.36
Operating profit (EBITDA)-3.36-3.36-3.36-3.36-3.36-3.36-3.36
Depreciation2.882.452.081.771.511.281.09
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.351.170.960.750.540.330.11
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.60-6.98-6.40-5.88-5.40-4.97-4.56
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.60-6.98-6.40-5.88-5.40-4.97-4.56

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.60-6.98-6.40-5.88-5.40-4.97-4.56
Depreciation2.882.452.081.771.511.281.09
Cash accruals (PAT + depreciation)-4.71-4.53-4.32-4.11-3.90-3.69-3.48
Term loan repaid0.961.921.921.921.921.921.92
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.67-6.46-6.24-6.03-5.82-5.61-5.40
Cash and bank-5.67-12.13-18.37-24.41-30.23-35.84-41.23

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.736.736.736.736.736.736.73
Reserves and surplus-7.60-14.58-20.99-26.87-32.27-37.24-41.80
Term loan outstanding11.549.617.695.773.851.920.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities10.671.76-6.57-14.37-21.70-28.58-35.07
Net fixed assets16.3413.8911.8110.048.537.256.16
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.67-12.13-18.37-24.41-30.23-35.84-41.23
Total assets10.671.76-6.57-14.37-21.70-28.58-35.07

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.45-1.09-1.17-1.26-1.37-1.49-1.65
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.35
Lowest DSCR-1.65
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.882.452.081.771.511.281.09

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
112.501.350.9611.54
211.541.171.929.61
39.610.961.927.69
47.690.751.925.77
55.770.541.923.85
63.850.331.921.92
71.920.111.920.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Type-test and BIS certificates that the buying utility's tender asks for
  • State Pollution Control Board consent to establish and operate

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Smart Energy Meter (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Smart_Energy_Meter_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.