Building BusinessServices

Section 24

Soil and Water Testing Laboratory

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹5.24 lakh and ₹5.24 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Soil and Water Testing Laboratory

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹4.14 L
Term loan from bank
₹2.69 L
Promoter’s contribution
₹0.41 L
Subsidy
₹1.03 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.64 L
Average DSCR
-5.58
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

A small rural lab that tests farmers' soil and irrigation water for a fee and advises them on fertiliser use and land reclamation.

Main product or serviceSoil and Water Testing Laboratory
Installed capacity per year (at 100%)10,000 units

04 Market

  • Farmers in the taluka, especially growers of commercial crops and vegetables
  • Farmers with saline or alkaline land
  • Farmers needing input testing or bio-fertilisers
  • Samples received at the lab
  • Field visits, training and demonstrations in villages

05 Plant and machinery

ItemQty₹Total ₹
Laboratory equipment — pH meter, EC meter, photometer, colorimeter, glassware and lab furniture12,32,0002,32,000
Wooden drawer cabinets for keeping samples (× 2 sets)120,00020,000
Office equipment — furniture, motorcycle, computer, telephone, audio-visual aids, contingencies11,17,0001,17,000
Water and electricity supply to the lab125,00025,000
Total3,94,000

Pre-filled from: MANAGE Agri-Clinics & Agri-Business Centres model project — Soil, Water Quality and Input Testing Laboratory Services Centre. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Laboratory chemicals and reagents — opening stock of ₹20,000 in the model
  • Soil and irrigation water samples — brought by farmers or collected on field visits

07 Cost of project

₹ in lakh
Plant and machinery3.94
Contingency0.20
Total fixed capital4.14
Working capital margin0.00
Total project cost4.14

08 Means of finance

₹ in lakh%
Promoter’s contribution0.4110.0
Subsidy1.0325.0
Term loan from bank2.6965.0
Total4.14100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.080.080.080.080.080.080.08
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.982.982.982.982.982.982.98
Operating profit (EBITDA)-2.98-2.98-2.98-2.98-2.98-2.98-2.98
Depreciation0.620.530.450.380.320.280.23
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.290.250.210.160.120.070.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.90-3.76-3.64-3.53-3.42-3.33-3.24
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.90-3.76-3.64-3.53-3.42-3.33-3.24

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.90-3.76-3.64-3.53-3.42-3.33-3.24
Depreciation0.620.530.450.380.320.280.23
Cash accruals (PAT + depreciation)-3.27-3.24-3.19-3.14-3.10-3.05-3.01
Term loan repaid0.210.410.410.410.410.410.41
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.48-3.65-3.60-3.56-3.51-3.47-3.42
Cash and bank-3.48-7.13-10.73-14.29-17.81-21.27-24.69

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.451.451.451.451.451.451.45
Reserves and surplus-3.90-7.66-11.30-14.82-18.25-21.57-24.82
Term loan outstanding2.482.071.651.240.830.410.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities0.04-4.14-8.19-12.13-15.97-19.71-23.37
Net fixed assets3.522.992.542.161.841.561.33
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.48-7.13-10.73-14.29-17.81-21.27-24.69
Total assets0.04-4.14-8.19-12.13-15.97-19.71-23.37

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-5.99-4.48-4.81-5.19-5.64-6.17-6.81
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-5.58
Lowest DSCR-6.81
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.620.530.450.380.320.280.23

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.690.290.212.48
22.480.250.412.07
32.070.210.411.65
41.650.160.411.24
51.240.120.410.83
60.830.070.410.41
70.410.020.410.00

17 Licences and registrations

  • Udyam registration
  • Shop and establishment or trade licence as the local body requires
  • Recognition of the lab by the State Agriculture Department if you want to issue soil health cards
  • Safe storage and disposal of lab chemicals as per local pollution rules

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus

19 Sources

  1. MANAGE Agri-Clinics & Agri-Business Centres model project — Soil, Water Quality and Input Testing Laboratory Services Centre — https://www.agriclinics.net/SoilWater.htm

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.