Solar Lantern Assembly

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹21.45 lakh and ₹21.45 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Solar Lantern Assembly

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.68 L
Term loan from bank
₹2.39 L
Promoter’s contribution
₹0.37 L
Subsidy
₹0.92 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.55 L
Average DSCR
-6.26
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble solar lanterns from a PV module, battery, LEDs and a plastic cabinet, and test them.

Main product or serviceSolar Lantern Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Homes in villages with poor power supply
  • Farmers, shops and hawkers
  • Government, NGO and disaster-relief programmes
  • Solar and electrical dealers
  • Government and NGO tenders
  • Online marketplaces

05 Plant and machinery

ItemQty₹Total ₹
Drilling machine113,00013,000
Portable grinder110,00010,000
Power supply, 0–30 V, 3 A (× 2)150,00050,000
High-voltage breakdown tester140,00040,000
Auto transformer110,00010,000
Insulation tester110,00010,000
Testing set-up (voltmeter, ammeter, wattmeter, etc.)163,00063,000
Digital multimeter (× 2)118,00018,000
Analogue multimeter (× 3)16,0006,000
Servo voltage stabiliser130,00030,000
Electrification and installation (10%) (× LS)125,00025,000
Temperature-controlled soldering stations, tools, jigs, fixtures, electronic screwdrivers (× LS)175,00075,000
Total3,50,000

Pre-filled from: PMEGP sample project report — Solar Lantern (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022 edition. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Solar PV module, 12 V / 10 Wp — ₹620 per lantern (report)
  • Battery, 12 V / 7 Ah — ₹600 per lantern
  • High-quality LEDs (5) — ₹110 per lantern (₹22 each)
  • Plastic cabinet — ₹150 per lantern
  • PCB, semiconductors, resistors, capacitors, transistors — ₹140 per lantern
  • Switch, input connector, fuse and holder, cables — ₹80 per lantern (₹20 each)

07 Cost of project

₹ in lakh
Plant and machinery3.50
Contingency0.18
Total fixed capital3.68
Working capital margin0.00
Total project cost3.68

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3710.0
Subsidy0.9225.0
Term loan from bank2.3965.0
Total3.68100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.070.070.070.070.070.070.07
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.972.972.972.972.972.972.97
Operating profit (EBITDA)-2.97-2.97-2.97-2.97-2.97-2.97-2.97
Depreciation0.550.470.400.340.290.240.21
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.260.220.180.140.100.060.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.78-3.66-3.55-3.45-3.36-3.28-3.20
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.78-3.66-3.55-3.45-3.36-3.28-3.20

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.78-3.66-3.55-3.45-3.36-3.28-3.20
Depreciation0.550.470.400.340.290.240.21
Cash accruals (PAT + depreciation)-3.23-3.20-3.16-3.12-3.07-3.03-2.99
Term loan repaid0.180.370.370.370.370.370.37
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.41-3.56-3.52-3.48-3.44-3.40-3.36
Cash and bank-3.41-6.98-10.50-13.98-17.43-20.83-24.19

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.291.291.291.291.291.291.29
Reserves and surplus-3.78-7.45-11.00-14.45-17.82-21.09-24.30
Term loan outstanding2.211.841.471.100.740.370.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.29-4.32-8.24-12.06-15.79-19.44-23.01
Net fixed assets3.122.662.261.921.631.391.18
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.41-6.98-10.50-13.98-17.43-20.83-24.19
Total assets-0.29-4.32-8.24-12.06-15.79-19.44-23.01

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-6.72-5.02-5.39-5.82-6.32-6.91-7.63
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-6.26
Lowest DSCR-7.63
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.550.470.400.340.290.240.21

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.390.260.182.21
22.210.220.371.84
31.840.180.371.47
41.470.140.371.10
51.100.100.370.74
60.740.060.370.37
70.370.020.370.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • BIS registration for any parts or products notified under the Compulsory Registration Scheme (check batteries and LED items)
  • E-waste (EPR) registration for batteries and electronics, where it applies

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Solar Lantern (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Solar_Lantern_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.