Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹14.3 lakh and ₹14.3 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Soldering Wire Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹1.87 L
Term loan from bank
₹1.21 L
Promoter’s contribution
₹0.19 L
Subsidy
₹0.47 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.22 L
Average DSCR
-12.12
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Melt tin, lead and antimony, cast rods with a rosin core and roll them into solder wire.

Main product or serviceSoldering Wire Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Electronics assemblers and repair shops
  • Electrical contractors and panel makers
  • Telephone and communication equipment makers
  • Electrical and electronics wholesalers
  • Direct supply to factories
  • Sales agents

05 Plant and machinery

ItemQty₹Total ₹
Coke fire-pit furnace with 1 HP motor and accessories (× 2)120,00020,000
Bar rolling plant with 2 HP motor (× 2)132,00032,000
Rolling machine for rolling bar to inner section (× 2)116,00016,000
Wire rolling machine with 1 HP motor (× 4)120,00020,000
Wire cutting machine with 1 HP motor (× 2)110,00010,000
Wire winding machine with 1 HP motor (× 2)18,0008,000
Chemical testing equipment (× LS)115,00015,000
Weighing balances (× 2)17,0007,000
Tools, jigs and dies (× LS)150,00050,000
Total1,78,000

Pre-filled from: PMEGP sample project report — Soldering Wire (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022 edition. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Tin (imported) — 15,000 kg a year at ₹377 a kg = ₹56.55 L (full capacity, as printed)
  • Lead (Indian) — 15,000 kg a year at ₹40 a kg = ₹6.00 L
  • Antimony (imported) — 900 kg a year at ₹280 a kg
  • Rosin and glycerine (flux) — ₹1,20,000 a year
  • Hard coke (fuel) — 4 tonnes a year at ₹6,000 a tonne

07 Cost of project

₹ in lakh
Plant and machinery1.78
Contingency0.09
Total fixed capital1.87
Working capital margin0.00
Total project cost1.87

08 Means of finance

₹ in lakh%
Promoter’s contribution0.1910.0
Subsidy0.4725.0
Term loan from bank1.2165.0
Total1.87100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.040.040.040.040.040.040.04
Insurance0.010.010.010.010.010.010.01
Total cost of operations2.932.932.932.932.932.932.93
Operating profit (EBITDA)-2.93-2.93-2.93-2.93-2.93-2.93-2.93
Depreciation0.280.240.200.170.150.120.11
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.130.110.090.070.050.030.01
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.34-3.28-3.22-3.17-3.13-3.08-3.04
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.34-3.28-3.22-3.17-3.13-3.08-3.04

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.34-3.28-3.22-3.17-3.13-3.08-3.04
Depreciation0.280.240.200.170.150.120.11
Cash accruals (PAT + depreciation)-3.06-3.04-3.02-3.00-2.98-2.96-2.94
Term loan repaid0.090.190.190.190.190.190.19
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.15-3.23-3.21-3.19-3.17-3.15-3.12
Cash and bank-3.15-6.38-9.59-12.77-15.94-19.08-22.21

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.650.650.650.650.650.650.65
Reserves and surplus-3.34-6.62-9.84-13.01-16.14-19.22-22.26
Term loan outstanding1.120.930.750.560.370.190.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-1.56-5.03-8.44-11.80-15.11-18.38-21.61
Net fixed assets1.591.351.150.980.830.700.60
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.15-6.38-9.59-12.77-15.94-19.08-22.21
Total assets-1.56-5.03-8.44-11.80-15.11-18.38-21.61

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-13.01-9.73-10.44-11.27-12.24-13.39-14.78
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-12.12
Lowest DSCR-14.78
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.280.240.200.170.150.120.11

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
11.210.130.091.12
21.120.110.190.93
30.930.090.190.75
40.750.070.190.56
50.560.050.190.37
60.370.030.190.19
70.190.010.190.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent — the report says the process causes some pollution
  • Factories Act registration and worker health checks for lead exposure
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Soldering Wire (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/soldering_wire_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.