Detailed Project Report

Stainless Steel Watch Strap Unit

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.85 L
Term loan from bank
₹2.50 L
Promoter’s contribution
₹0.38 L
Subsidy
₹0.96 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.59 L
Average DSCR
-5.99
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Press stainless steel scrap into links and assemble metal watch straps for watch makers and the repair market.

Main product or serviceStainless Steel Watch Strap Unit
Installed capacity per year (at 100%)10,000 units

04 Market

  • Watch companies (the reports name Titan, HMT, Maxima, Allwyn and Timex)
  • Small watch assembly units
  • Watch shops for replacement straps
  • Supply contracts with watch makers
  • Watch-parts wholesalers

05 Plant and machinery

ItemQty₹Total ₹
Inclinable power press, 10 tonne, 5 HP180,00080,000
Power press, 2 HP (× 2)180,00080,000
Bench drill, 12 mm18,0008,000
Buffing lathe, 1 HP120,00020,000
Disc and belt sand grinding machine120,00020,000
Pedestal grinder, 200 mm110,00010,000
Surface grinder, 550 × 200 mm table165,00065,000
Work bench, vice, hand tools, dies, punches, measuring tools (× 1 lot)150,00050,000
Installation and electrification (10%) (× —)133,30033,300
Total3,66,300

Pre-filled from: PMEGP sample project report — Stainless Steel Watch Strap Unit (prepared by Udyami/Samadhan); PMEGP sample project report — Steel Watch Strap (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Stainless steel sheet scrap, 16–30 SWG — 36 MT a year at ₹60,000 per MT = ₹21.60 L at full capacity
  • Spring bars and link bars — 4,320 at ₹55 = ₹2.38 L a year
  • Packaging — ₹5 a strap

07 Cost of project

₹ in lakh
Plant and machinery3.66
Contingency0.18
Total fixed capital3.85
Working capital margin0.00
Total project cost3.85

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3810.0
Subsidy0.9625.0
Term loan from bank2.5065.0
Total3.85100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.080.080.080.080.080.080.08
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.982.982.982.982.982.982.98
Operating profit (EBITDA)-2.98-2.98-2.98-2.98-2.98-2.98-2.98
Depreciation0.580.490.420.350.300.260.22
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.270.230.190.150.110.070.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.82-3.70-3.59-3.48-3.38-3.30-3.22
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.82-3.70-3.59-3.48-3.38-3.30-3.22

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.82-3.70-3.59-3.48-3.38-3.30-3.22
Depreciation0.580.490.420.350.300.260.22
Cash accruals (PAT + depreciation)-3.25-3.21-3.17-3.13-3.08-3.04-3.00
Term loan repaid0.190.380.380.380.380.380.38
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.44-3.60-3.55-3.51-3.47-3.43-3.38
Cash and bank-3.44-7.03-10.59-14.10-17.57-20.99-24.38

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.351.351.351.351.351.351.35
Reserves and surplus-3.82-7.52-11.11-14.59-17.97-21.27-24.49
Term loan outstanding2.311.921.541.150.770.380.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.17-4.26-8.23-12.09-15.86-19.54-23.14
Net fixed assets3.272.782.362.011.711.451.23
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.44-7.03-10.59-14.10-17.57-20.99-24.38
Total assets-0.17-4.26-8.23-12.09-15.86-19.54-23.14

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-6.43-4.81-5.16-5.57-6.05-6.62-7.30
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-5.99
Lowest DSCR-7.30
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.580.490.420.350.300.260.22

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.500.270.192.31
22.310.230.381.92
31.920.190.381.54
41.540.150.381.15
51.150.110.380.77
60.770.070.380.38
70.380.020.380.00

17 Licences and registrations

  • Udyam
  • GST
  • Trade licence
  • Factory licence if worker numbers cross the limit

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Stainless Steel Watch Strap Unit (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Stainless_Steel_Watch_Strap_Unit_%28_Samadhan_Projects_%29.pdf
  2. PMEGP sample project report — Steel Watch Strap (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Steel_Watch_Strap_DPR_%28_Samadhan_Projects_%29.pdf
  3. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.