01 Project at a glance

Total project cost
₹78.33 L
Term loan from bank
₹70.50 L
Promoter’s contribution
₹7.83 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-18.75 L
Average DSCR
-0.35
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Melt steel scrap in an induction furnace and cast tough parts — valve bodies, pump casings, gears — for industry.

Main product or serviceSteel Castings (Induction Furnace Foundry)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Railways and their suppliers
  • Cement, power and fertiliser plants
  • Pump, valve and gear makers
  • Chemical, pharma and dairy-equipment makers
  • Direct orders against drawings
  • Vendor registration with large buyers and PSUs

05 Plant and machinery

ItemQty₹Total ₹
Medium-frequency induction melting furnace, 750 kg135,00,00035,00,000
Cooling tower, water softening plant, heat exchanger18,50,0008,50,000
Moulding machines (× 3)17,50,0007,50,000
Sand mixer, sieves etc.11,50,0001,50,000
Core moulding machines (× 2)150,00050,000
Sand reclamation system12,00,0002,00,000
Core baking oven170,00070,000
Ladles with heating system (× 2)160,00060,000
EOT crane13,50,0003,50,000
Shot blasting machine12,00,0002,00,000
Lathes, drilling and milling machines (× 2 + 1 + 1)15,00,0005,00,000
Metallurgical microscope and sample polishing machine (× 1 + 1)12,80,0002,80,000
Physical and chemical testing labs (× 1 lot each)15,00,0005,00,000
Total74,60,000

Pre-filled from: SIDBI Stand-Up Mitra project profile — Steel Castings. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Assorted steel scrap or ingots — the basic melting stock
  • Ferro-alloys and micro-alloying additions — manganese, silicon, chromium, nickel, vanadium, molybdenum as the grade needs
  • Moulding sand, fluxes, refractory powder and pattern material — consumables for moulds and cores

07 Cost of project

₹ in lakh
Plant and machinery74.60
Contingency3.73
Total fixed capital78.33
Working capital margin0.00
Total project cost78.33

08 Means of finance

₹ in lakh%
Promoter’s contribution7.8310.0
Term loan from bank70.5090.0
Total78.33100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance1.571.571.571.571.571.571.57
Insurance0.390.390.390.390.390.390.39
Total cost of operations4.844.844.844.844.844.844.84
Operating profit (EBITDA)-4.84-4.84-4.84-4.84-4.84-4.84-4.84
Depreciation11.759.998.497.226.135.214.43
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan7.636.615.424.233.031.840.65
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-24.22-21.44-18.75-16.28-14.00-11.89-9.92
Income tax0.000.000.000.000.000.000.00
Profit after tax-24.22-21.44-18.75-16.28-14.00-11.89-9.92

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-24.22-21.44-18.75-16.28-14.00-11.89-9.92
Depreciation11.759.998.497.226.135.214.43
Cash accruals (PAT + depreciation)-12.47-11.45-10.26-9.06-7.87-6.68-5.48
Term loan repaid5.4210.8510.8510.8510.8510.8510.85
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-17.89-22.30-21.10-19.91-18.72-17.52-16.33
Cash and bank-17.89-40.19-61.29-81.20-99.91-117.44-133.77

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)7.837.837.837.837.837.837.83
Reserves and surplus-24.22-45.65-64.40-80.68-94.68-106.57-116.49
Term loan outstanding65.0754.2343.3832.5421.6910.850.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities48.6916.41-13.18-40.31-65.16-87.90-108.66
Net fixed assets66.5856.5948.1040.8934.7629.5425.11
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-17.89-40.19-61.29-81.20-99.91-117.44-133.77
Total assets48.6916.41-13.18-40.31-65.16-87.90-108.66

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.37-0.28-0.30-0.32-0.35-0.38-0.42
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.35
Lowest DSCR-0.42
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation11.759.998.497.226.135.214.43

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
170.507.635.4265.07
265.076.6110.8554.23
354.235.4210.8543.38
443.384.2310.8532.54
532.543.0310.8521.69
621.691.8410.8510.85
710.850.6510.850.00

17 Licences and registrations

  • Udyam registration
  • GST
  • State Pollution Control Board consent (foundries need dust and fume control)
  • Factory licence and fire NOC
  • High-tension electricity connection
  • IEC code for export

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. SIDBI Stand-Up Mitra project profile — Steel Castings — https://www.standupmitra.in/Default/ViewFile/?id=1514557486630_Steel%20%20Castings.docx&path=ProjectProfile

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.