01 Project at a glance

Total project cost
₹26.04 L
Term loan from bank
₹23.43 L
Promoter’s contribution
₹2.60 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-8.15 L
Average DSCR
-0.76
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Heating cut steel bars in a furnace and hammering them in dies into strong shaped parts for vehicle and machine makers.

Main product or serviceSteel Forgings (Hammer Forging Unit)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Vehicle and auto part makers
  • Machine and engineering goods makers
  • Defence and aerospace suppliers
  • Machine shops that finish forged blanks
  • Job orders against customer drawings
  • Approved-vendor supply to manufacturers
  • Sub-contract work for larger forge shops

05 Plant and machinery

ItemQty₹Total ₹
Heavy duty centre lathe with 3 HP motor11,10,0001,10,000
Double ended pedestal grinder, 2 HP111,60011,600
High speed shaping machine, 630 mm stroke, 3 HP11,15,0001,15,000
Electric normalising furnace, 1500 mm × 600 mm11,70,0001,70,000
Oil fired pre-heating furnace with burners, blowers and oil tank11,75,0001,75,000
Pillar drill machine, 1 HP112,00012,000
Platform weighing machine, 500 kg112,00012,000
Pneumatic power hammer, 500 kg, with 33 HP motor15,40,0005,40,000
Power hacksaw, 1 HP130,00030,000
Rockwell hardness tester140,00040,000
Friction drop hammer, 500 kg, with 25 HP motor14,00,0004,00,000
Shot blasting chamber with 7.5 HP motor13,60,0003,60,000
Tools, dies and equipment11,50,0001,50,000
Trimming power press, 60 tonnes, with 5 HP motor11,75,0001,75,000
Installation and electrification11,79,0001,79,000
Total24,79,600

Pre-filled from: DC-MSME project profile — Steel Forgings. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Forging quality steel ingots or rods to the customer's specification — 60 MT a month at ₹19,000 per MT (2003)
  • Die steel and MS plates — ₹58,000 a month
  • Furnace oil — for the pre-heating furnace; the profile prints no separate cost
  • Lubricating oil, cotton waste and packing material — ₹9,000 a month

07 Cost of project

₹ in lakh
Plant and machinery24.80
Contingency1.24
Total fixed capital26.04
Working capital margin0.00
Total project cost26.04

08 Means of finance

₹ in lakh%
Promoter’s contribution2.6010.0
Term loan from bank23.4390.0
Total26.04100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.520.520.520.520.520.520.52
Insurance0.130.130.130.130.130.130.13
Total cost of operations3.533.533.533.533.533.533.53
Operating profit (EBITDA)-3.53-3.53-3.53-3.53-3.53-3.53-3.53
Depreciation3.913.322.822.402.041.731.47
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan2.542.201.801.401.010.610.21
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-9.97-9.05-8.15-7.33-6.58-5.88-5.22
Income tax0.000.000.000.000.000.000.00
Profit after tax-9.97-9.05-8.15-7.33-6.58-5.88-5.22

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-9.97-9.05-8.15-7.33-6.58-5.88-5.22
Depreciation3.913.322.822.402.041.731.47
Cash accruals (PAT + depreciation)-6.07-5.73-5.33-4.94-4.54-4.14-3.75
Term loan repaid1.803.603.603.603.603.603.60
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-7.87-9.33-8.94-8.54-8.14-7.75-7.35
Cash and bank-7.87-17.20-26.14-34.68-42.82-50.57-57.92

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.602.602.602.602.602.602.60
Reserves and surplus-9.97-19.02-27.17-34.51-41.09-46.96-52.18
Term loan outstanding21.6318.0214.4210.817.213.600.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities14.261.61-10.15-21.09-31.27-40.75-49.58
Net fixed assets22.1318.8115.9913.5911.559.828.35
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-7.87-17.20-26.14-34.68-42.82-50.57-57.92
Total assets14.261.61-10.15-21.09-31.27-40.75-49.58

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.81-0.61-0.65-0.70-0.77-0.84-0.92
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.76
Lowest DSCR-0.92
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation3.913.322.822.402.041.731.47

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
123.432.541.8021.63
221.632.203.6018.02
318.021.803.6014.42
414.421.403.6010.81
510.811.013.607.21
67.210.613.603.60
73.600.213.600.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent (the profile requires an NOC)
  • Licence to store furnace oil where the quantity needs it
  • BIS certification where a Quality Control Order applies

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)