Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹23.42 lakh and ₹23.42 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Towel Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹18.38 L
Term loan from bank
₹11.94 L
Promoter’s contribution
₹1.84 L
Subsidy
₹4.59 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.25 L
Average DSCR
-1.41
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Weave terry towel fabric on a power loom, bleach, dye, cut, stitch and pack towels.

Main product or serviceTowel Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households
  • Hotels and hospitals
  • Gyms, salons and spas
  • Textile wholesalers
  • Direct supply to hotels and hospitals
  • Retail and online stores

05 Plant and machinery

ItemQty₹Total ₹
Power loom15,00,0005,00,000
Terry towel fabric dyeing machine11,25,0001,25,000
Towel length cutting machine110,00,00010,00,000
Stitching machine125,00025,000
Boiler150,00050,000
Material handling and other equipment150,00050,000
Total17,50,000

Pre-filled from: PMEGP sample project report — Towel Manufacturing (prepared by Udyami/Samadhan); DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Yarn — spun with synthetic fibre and polyester, as the report states
  • PVA starch — for sizing
  • Bleaching material — hydrogen peroxide, caustic, defoamers and other chemicals

07 Cost of project

₹ in lakh
Plant and machinery17.50
Contingency0.88
Total fixed capital18.38
Working capital margin0.00
Total project cost18.38

08 Means of finance

₹ in lakh%
Promoter’s contribution1.8410.0
Subsidy4.5925.0
Term loan from bank11.9465.0
Total18.38100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.370.370.370.370.370.370.37
Insurance0.090.090.090.090.090.090.09
Total cost of operations3.343.343.343.343.343.343.34
Operating profit (EBITDA)-3.34-3.34-3.34-3.34-3.34-3.34-3.34
Depreciation2.762.341.991.691.441.221.04
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.291.120.920.720.510.310.11
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.39-6.80-6.25-5.75-5.29-4.87-4.49
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.39-6.80-6.25-5.75-5.29-4.87-4.49

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.39-6.80-6.25-5.75-5.29-4.87-4.49
Depreciation2.762.341.991.691.441.221.04
Cash accruals (PAT + depreciation)-4.63-4.46-4.26-4.06-3.85-3.65-3.45
Term loan repaid0.921.841.841.841.841.841.84
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.55-6.30-6.09-5.89-5.69-5.49-5.29
Cash and bank-5.55-11.85-17.94-23.84-29.53-35.01-40.30

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.436.436.436.436.436.436.43
Reserves and surplus-7.39-14.19-20.44-26.19-31.48-36.35-40.84
Term loan outstanding11.039.197.355.513.681.840.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities10.071.43-6.66-14.24-21.37-28.08-34.41
Net fixed assets15.6213.2811.289.598.156.935.89
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.55-11.85-17.94-23.84-29.53-35.01-40.30
Total assets10.071.43-6.66-14.24-21.37-28.08-34.41

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.51-1.13-1.21-1.31-1.42-1.55-1.72
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.41
Lowest DSCR-1.72
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.762.341.991.691.441.221.04

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
111.941.290.9211.03
211.031.121.849.19
39.190.921.847.35
47.350.721.845.51
55.510.511.843.68
63.680.311.841.84
71.840.111.840.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent (bleaching and dyeing effluent)
  • Factory licence if worker count crosses the limit
  • Trademark for the brand

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Towel Manufacturing (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Towel_DPR_%28_Samadhan_Projects_%29.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.