Detailed Project Report

Transformer Parts and Brass Accessories

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹34.65 L
Term loan from bank
₹31.19 L
Promoter’s contribution
₹3.47 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-9.90 L
Average DSCR
-0.60
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cast brass scrap and machine it into nuts, terminals, fittings and other small parts used on transformers and electrical equipment.

Main product or serviceTransformer Parts and Brass Accessories
Installed capacity per year (at 100%)10,000 units

04 Market

  • Transformer manufacturers
  • Transformer repair workshops
  • Electrical equipment makers
  • Direct supply to manufacturers
  • Electrical hardware dealers

05 Plant and machinery

ItemQty₹Total ₹
Foundry (brass melting and sand casting)113,00,00013,00,000
Machining division (centre lathe, special-purpose machines, threading, drilling)18,00,0008,00,000
Milling and other division13,00,0003,00,000
Packing and finishing division (× lump sum)12,00,0002,00,000
Laboratory division13,00,0003,00,000
Installation, electrification, taxes and transport (× lump sum)14,00,0004,00,000
Total33,00,000

Pre-filled from: SIDBI Stand-Up Mitra project profile — Transformers Parts and Accessories; World Customs Organization – HS Nomenclature 2022, Chapter 74. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Brass scrap — the main raw material; sorted and melted in-house
  • Steel, aluminium and copper — for some parts
  • Brass rods — drawn on a drawing machine

07 Cost of project

₹ in lakh
Plant and machinery33.00
Contingency1.65
Total fixed capital34.65
Working capital margin0.00
Total project cost34.65

08 Means of finance

₹ in lakh%
Promoter’s contribution3.4710.0
Term loan from bank31.1990.0
Total34.65100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.690.690.690.690.690.690.69
Insurance0.170.170.170.170.170.170.17
Total cost of operations3.753.753.753.753.753.753.75
Operating profit (EBITDA)-3.75-3.75-3.75-3.75-3.75-3.75-3.75
Depreciation5.204.423.763.192.712.311.96
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.382.922.401.871.340.810.29
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-12.32-11.09-9.90-8.81-7.80-6.87-5.99
Income tax0.000.000.000.000.000.000.00
Profit after tax-12.32-11.09-9.90-8.81-7.80-6.87-5.99

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-12.32-11.09-9.90-8.81-7.80-6.87-5.99
Depreciation5.204.423.763.192.712.311.96
Cash accruals (PAT + depreciation)-7.12-6.67-6.14-5.62-5.09-4.56-4.03
Term loan repaid2.404.804.804.804.804.804.80
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-9.52-11.47-10.94-10.41-9.89-9.36-8.83
Cash and bank-9.52-20.99-31.93-42.34-52.23-61.59-70.42

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.473.473.473.473.473.473.47
Reserves and surplus-12.32-23.41-33.31-42.11-49.91-56.78-62.77
Term loan outstanding28.7923.9919.1914.399.604.800.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities19.934.05-10.65-24.26-36.85-48.52-59.31
Net fixed assets29.4525.0321.2818.0915.3713.0711.11
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-9.52-20.99-31.93-42.34-52.23-61.59-70.42
Total assets19.934.05-10.65-24.26-36.85-48.52-59.31

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.65-0.49-0.52-0.56-0.61-0.67-0.74
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.60
Lowest DSCR-0.74
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation5.204.423.763.192.712.311.96

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
131.193.382.4028.79
228.792.924.8023.99
323.992.404.8019.19
419.191.874.8014.39
514.391.344.809.60
69.600.814.804.80
74.800.294.800.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent (non-ferrous foundry)
  • Factory licence
  • Hazardous and Other Wastes Rules authorisation if you handle brass dross or scrap under those rules
  • Fire safety clearance for the furnace area

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. SIDBI Stand-Up Mitra project profile — Transformers Parts and Accessories — https://www.standupmitra.in/Default/ViewFile/?id=1520964877705_Transformer%20Parts%20and%20Accssories.docx&path=ProjectProfile
  2. World Customs Organization – HS Nomenclature 2022, Chapter 74 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1574_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.