Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹22.26 lakh and ₹22.26 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Tyre Retreading Unit

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹16.22 L
Term loan from bank
₹10.54 L
Promoter’s contribution
₹1.62 L
Subsidy
₹4.06 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.85 L
Average DSCR
-1.57
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Put a new tread on worn car tyres by the precured 'cold process', so owners get a usable tyre at a lower price than a new one.

Main product or serviceTyre Retreading Unit
Installed capacity per year (at 100%)10,000 units

04 Market

  • Transporters and fleet owners
  • Taxi and car owners
  • Bus and truck operators (the report notes retreading is spreading in commercial vehicles)
  • Direct work for local transporters
  • Tyre dealers and tyre shops that collect worn tyres
  • Repeat contracts with fleets

05 Plant and machinery

ItemQty₹Total ₹
Buffing machine with dust collector, builder, tyre bonder (truck / three-tyre LCV / passenger) with curing rims and electric hoist18,50,0008,50,000
Work bench, envelope / tyre stand and gantry175,00075,000
Boiler, 300 kg/hr14,50,0004,50,000
Air compressor, 100 lbs working pressure, with 5 HP motor170,00070,000
Auxiliary items: pipe erection, electric fittings, retreading tools, mechanical hoist with trolley (× lump sum)11,00,0001,00,000
Total15,45,000

Pre-filled from: PMEGP sample project report — Automobile Tyre Retreading (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Precured tread rubber — 28 MT a year at full capacity, ₹1,15,000 per MT
  • Cushion compound — 2,800 litres a year, ₹120 per litre
  • Vulcanising solution — 100 litres a year, ₹120 per litre
  • Envelope — 6,000 pieces a year, ₹30 each

07 Cost of project

₹ in lakh
Plant and machinery15.45
Contingency0.77
Total fixed capital16.22
Working capital margin0.00
Total project cost16.22

08 Means of finance

₹ in lakh%
Promoter’s contribution1.6210.0
Subsidy4.0625.0
Term loan from bank10.5465.0
Total16.22100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.320.320.320.320.320.320.32
Insurance0.080.080.080.080.080.080.08
Total cost of operations3.293.293.293.293.293.293.29
Operating profit (EBITDA)-3.29-3.29-3.29-3.29-3.29-3.29-3.29
Depreciation2.432.071.761.491.271.080.92
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.140.990.810.630.450.280.10
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30
Depreciation2.432.071.761.491.271.080.92
Cash accruals (PAT + depreciation)-4.43-4.27-4.10-3.92-3.74-3.56-3.38
Term loan repaid0.811.621.621.621.621.621.62
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.24-5.90-5.72-5.54-5.36-5.18-5.00
Cash and bank-5.24-11.13-16.85-22.39-27.75-32.94-37.94

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)5.685.685.685.685.685.685.68
Reserves and surplus-6.86-13.20-19.06-24.47-29.48-34.12-38.42
Term loan outstanding9.738.116.494.873.241.620.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities8.550.59-6.89-13.92-20.56-26.82-32.74
Net fixed assets13.7911.729.968.477.206.125.20
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.24-11.13-16.85-22.39-27.75-32.94-37.94
Total assets8.550.59-6.89-13.92-20.56-26.82-32.74

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.68-1.26-1.35-1.46-1.58-1.73-1.91
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.57
Lowest DSCR-1.91
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.432.071.761.491.271.080.92

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
110.541.140.819.73
29.730.991.628.11
38.110.811.626.49
46.490.631.624.87
54.870.451.623.24
63.240.281.621.62
71.620.101.620.00

17 Licences and registrations

  • GST registration (named in the report)
  • Udyam registration (the report names Udyog Aadhaar, now replaced by Udyam)
  • Trademark for your brand name (optional, named in the report)
  • Boiler registration with the state boiler inspectorate if your boiler is covered by the Boilers Act
  • State pollution board consent and trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Automobile Tyre Retreading (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Autombile_Tyre_Retreading_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.