UV-C Disinfector Box Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹182.06 lakh and ₹182.06 lakh.

Legal form
Applicant category
Location

Detailed Project Report

UV-C Disinfector Box Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹39.94 L
Term loan from bank
₹35.95 L
Promoter’s contribution
₹3.99 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-10.97 L
Average DSCR
-0.54
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Fabricate powder-coated steel boxes fitted with UV-C tubes, a moving tray and timers to disinfect small items without touching them.

Main product or serviceUV-C Disinfector Box Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Hospitals and clinics (masks, PPE, medicines)
  • Banks (currency, cheques, documents)
  • Offices, restaurants and apartments
  • Households (vegetables, keys, currency)
  • Direct institutional sales
  • Medical and electrical equipment dealers
  • Online marketplaces

05 Plant and machinery

ItemQty₹Total ₹
Hydraulic variable-rake-angle shearing machine, 3,000 mm17,50,0007,50,000
Hydraulic press brake, 100 t / 3,000 mm, NC back gauge18,70,0008,70,000
3-roll hydraulic plate rolling machine116,90,00016,90,000
Miscellaneous tools and accessories (× lump sum)194,20094,200
Office furniture, tools, fixtures and testing equipment (× lump sum)14,00,0004,00,000
Total38,04,200

Pre-filled from: MSME-DI Hyderabad project profile — UV Tubelight Sterilization Contactless Disinfector Box. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • MS sheet (1.0–3.0 mm) — 9,300 kg a month in four thicknesses, ₹10.16 L
  • PCBs with relays and timers — 300 a month, ₹9.60 L
  • UV-C bulbs — 1,500 a month (5 per box), ₹8.25 L
  • Stainless-steel trays with track — 300 a month, ₹3.30 L
  • Proximity switches — 600 a month, ₹1.44 L
  • DC motors, rubber gaskets, emergency switches, LED indicators — ₹2.23 L a month
  • Powder coating — ₹1.25 L a month

07 Cost of project

₹ in lakh
Plant and machinery38.04
Contingency1.90
Total fixed capital39.94
Working capital margin0.00
Total project cost39.94

08 Means of finance

₹ in lakh%
Promoter’s contribution3.9910.0
Term loan from bank35.9590.0
Total39.94100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.800.800.800.800.800.800.80
Insurance0.200.200.200.200.200.200.20
Total cost of operations3.883.883.883.883.883.883.88
Operating profit (EBITDA)-3.88-3.88-3.88-3.88-3.88-3.88-3.88
Depreciation5.995.094.333.683.132.662.26
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.893.372.762.151.550.940.33
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-13.76-12.34-10.97-9.71-8.55-7.48-6.47
Income tax0.000.000.000.000.000.000.00
Profit after tax-13.76-12.34-10.97-9.71-8.55-7.48-6.47

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-13.76-12.34-10.97-9.71-8.55-7.48-6.47
Depreciation5.995.094.333.683.132.662.26
Cash accruals (PAT + depreciation)-7.77-7.25-6.64-6.03-5.42-4.82-4.21
Term loan repaid2.775.535.535.535.535.535.53
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-10.54-12.78-12.17-11.56-10.96-10.35-9.74
Cash and bank-10.54-23.32-35.49-47.05-58.01-68.36-78.09

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.993.993.993.993.993.993.99
Reserves and surplus-13.76-26.10-37.07-46.79-55.34-62.82-69.28
Term loan outstanding33.1827.6522.1216.5911.065.530.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities23.425.54-10.96-26.20-40.28-53.29-65.29
Net fixed assets33.9528.8624.5320.8517.7215.0612.81
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-10.54-23.32-35.49-47.05-58.01-68.36-78.09
Total assets23.425.54-10.96-26.20-40.28-53.29-65.29

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.58-0.44-0.47-0.50-0.55-0.60-0.66
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.54
Lowest DSCR-0.66
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation5.995.094.333.683.132.662.26

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
135.953.892.7733.18
233.183.375.5327.65
327.652.765.5322.12
422.122.155.5316.59
516.591.555.5311.06
611.060.945.535.53
75.530.335.530.00

17 Licences and registrations

  • Udyam
  • GST
  • Germ-kill test report from an NABL-accredited lab (profile)
  • UV-C safety per ISO 15858 (profile)
  • Factory licence if worker numbers cross the limit

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. MSME-DI Hyderabad project profile — UV Tubelight Sterilization Contactless Disinfector Box — https://msmedihyderabad.gov.in/documents/report/7bed22b389c93ff263309213a9613c95.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.