Wood Particle Board (Medium Density)

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹573.81 lakh and ₹573.81 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Wood Particle Board (Medium Density)

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹241.50 L
Term loan from bank
₹217.35 L
Promoter’s contribution
₹24.15 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-51.80 L
Average DSCR
-0.21
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Chip wood waste, dry it, mix it with resin and hot-press it into particle boards for furniture, doors and partitions.

Main product or serviceWood Particle Board (Medium Density)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Furniture makers and modular-furniture units
  • Door, partition and interior contractors
  • Plywood and board dealers
  • Industries and households, as the profile puts it
  • Plywood and board wholesalers
  • Direct supply to furniture factories
  • Interior and building contractors

05 Plant and machinery

ItemQty₹Total ₹
Particle board line: chipper, dryer, glue mixer and spreader, hydraulic press, saw cutter and sanding machine (one each; priced as one lot) (× 1 set)12,25,00,0002,25,00,000
Office furniture, equipment and fixtures (× LS)15,00,0005,00,000
Total2,30,00,000

Pre-filled from: DC-MSME import-substitution DPR — Wooden Boards. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Wood particles — mainly wood chips, sawdust and planer shavings — 16,74,000 kg a month at ₹9 a kg = ₹1,50,66,000
  • Batten — 48,000 kg a month at ₹10 a kg = ₹4,80,000
  • Urea formaldehyde resin — 12,600 kg a month at ₹85 a kg = ₹10,71,000
  • Labelling and packing material — ₹50,000 a month

07 Cost of project

₹ in lakh
Plant and machinery230.00
Contingency11.50
Total fixed capital241.50
Working capital margin0.00
Total project cost241.50

08 Means of finance

₹ in lakh%
Promoter’s contribution24.1510.0
Term loan from bank217.3590.0
Total241.50100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance4.834.834.834.834.834.834.83
Insurance1.211.211.211.211.211.211.21
Total cost of operations8.928.928.928.928.928.928.92
Operating profit (EBITDA)-8.92-8.92-8.92-8.92-8.92-8.92-8.92
Depreciation36.2330.7926.1722.2518.9116.0713.66
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan23.5320.3816.7113.039.355.671.99
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-68.67-60.09-51.80-44.19-37.18-30.66-24.57
Income tax0.000.000.000.000.000.000.00
Profit after tax-68.67-60.09-51.80-44.19-37.18-30.66-24.57

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-68.67-60.09-51.80-44.19-37.18-30.66-24.57
Depreciation36.2330.7926.1722.2518.9116.0713.66
Cash accruals (PAT + depreciation)-32.44-29.30-25.62-21.94-18.27-14.59-10.91
Term loan repaid16.7233.4433.4433.4433.4433.4433.44
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-49.16-62.74-59.06-55.38-51.70-48.03-44.35
Cash and bank-49.16-111.90-170.96-226.35-278.05-326.08-370.43

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)24.1524.1524.1524.1524.1524.1524.15
Reserves and surplus-68.67-128.76-180.56-224.75-261.92-292.58-317.16
Term loan outstanding200.63167.19133.75100.3266.8833.440.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities156.1162.58-22.65-100.28-170.90-235.00-293.01
Net fixed assets205.28174.48148.31126.06107.1591.0877.42
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-49.16-111.90-170.96-226.35-278.05-326.08-370.43
Total assets156.1162.58-22.65-100.28-170.90-235.00-293.01

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.22-0.17-0.18-0.19-0.21-0.23-0.25
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.21
Lowest DSCR-0.25
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation36.2330.7926.1722.2518.9116.0713.66

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
1217.3523.5316.72200.63
2200.6320.3833.44167.19
3167.1916.7133.44133.75
4133.7513.0333.44100.32
5100.329.3533.4466.88
666.885.6733.4433.44
733.441.9933.440.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • No-objection certificates from the local authority, fire department and forest department
  • State Pollution Control Board consent, and BIS licence to IS 3087 where a quality control order applies

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME import-substitution DPR — Wooden Boards — https://dcmsme.gov.in/43_Wooden%20Board%20by%20RK%20Choudhry-converted.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.