§1What this business is
Grid power goes through a distribution and control panel to the chargers; software handles user input and billing. The report plans 4 AC chargers (7.2–7.5 kW, Type-2) and 1 DC charger (15 kW, GB/T), each running 12 hours a day, and suggests malls, where power can cost ₹4.5 a unit instead of ₹8.
Capacity: AC: 3,600 vehicles a year at 4 hours each; DC: 1,800 vehicles at 2 hours each; first year at 75%. Charges ₹300 per AC charge, ₹350 per DC charge, plus ₹30 an hour service charge. First-year revenue ₹18.23 lakh.
§2Is it right for you?
Who it is for
Someone with a site on a busy road, mall or parking area.
Who it is not for
Someone in an area with very few electric cars.
Advantages
- Electric vehicle numbers are rising
- Only 3 staff needed
- Little stock — mostly electricity
- Fits malls, hotels and parking areas
Drawbacks
- Usage in the early years can be low in small towns
- Software alone is ₹6 lakh in the report
- Profit depends on getting cheap power
- Charger standards and technology keep changing
Skills you need
- Electrical safety and maintenance
- Dealing with the DISCOM
- Listing on charging apps and maps
- Customer service
Why difficulty 3/5: Simple to run, but income depends on location and how fast EVs spread locally.
§3Market
Who buys
- Electric car owners
- Taxi and fleet operators
How it sells
- Roadside or mall site
- Charging apps and online maps
Good to know
- The report expects India's charging-infrastructure market to grow over 40% a year (2019–2025) with government support.
§4Raw material & machinery
| Item | Qty | Cost |
|---|---|---|
| AC charger 7.2–7.5 kW, Type-2 | 4 | ₹2,60,000 (₹65,000 each) |
| DC charger 15 kW, GB/T | 1 | ₹2,15,000 |
| Charging software | 1 | ₹6,00,000 |
| GST at 18% on the above | - | ₹1,93,500 |
From: PMEGP sample project report — EV Charging Station (prepared by Udyami/Samadhan)
- Electricity45 kW load; ₹60,750 a month at full use and ₹4.5 a unit
From: PMEGP sample project report — EV Charging Station (prepared by Udyami/Samadhan)
§5Licences & registration
- Udyam registration
- GST registration
- Electricity connection from the DISCOM (ask for the EV charging tariff)
- Trademark for your brand name (optional)
§6Schemes & subsidies
- PMEGPCentralActive15–35% subsidy
- MudraCentralActiveLoan up to ₹20 lakh, no collateral
- CGTMSECentralActiveNo collateral, up to ₹10 crore
PMEGP fits (service projects up to ₹20 lakh); MUDRA gives loans up to ₹20 lakh; CGTMSE lets the bank lend without collateral.
§7Money
How the investment is worked out: Plant & machinery ₹12.69 lakh (chargers and software incl. GST), furniture & other assets ₹1.31 lakh, working capital ₹3.33 lakh = ₹17.33 lakh. Site rented.
Working capital: Working capital ₹3.33 lakh with a ₹3.00 lakh bank limit (25% of sales method).
Year not printed on the report — check current machinery prices.
§8Export potential
A local service business; it has no goods to export.
§9Risks — where people fail
- Low vehicle traffic
- Electricity tariff changes
- Charger breakdowns
- Big networks opening nearby
§1030 / 60 / 90-day plan
A general plan that applies to any business. A plan for this business will be added after research.
- Days 1–30: Visit a working ev charging station unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
- Days 31–60: Udyam and the licences you need (Udyam registration, GST registration), a project report (DPR), and the scheme or loan file.
- Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.
§11Who to connect with
Associations, clusters and training institutes — the directory is being built. Connect
§12Watch
There is no episode on this business yet. Shows are coming soon on the Podcast page.
Want to start EV Charging Station?
DPR, loan file or registration — ask us on WhatsApp.
¶Sources
Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.
