§1What this business is

Grid power goes through a distribution and control panel to the chargers; software handles user input and billing. The report plans 4 AC chargers (7.2–7.5 kW, Type-2) and 1 DC charger (15 kW, GB/T), each running 12 hours a day, and suggests malls, where power can cost ₹4.5 a unit instead of ₹8.

Capacity: AC: 3,600 vehicles a year at 4 hours each; DC: 1,800 vehicles at 2 hours each; first year at 75%. Charges ₹300 per AC charge, ₹350 per DC charge, plus ₹30 an hour service charge. First-year revenue ₹18.23 lakh.

§2Is it right for you?

Who it is for

Someone with a site on a busy road, mall or parking area.

Who it is not for

Someone in an area with very few electric cars.

Advantages

  • Electric vehicle numbers are rising
  • Only 3 staff needed
  • Little stock — mostly electricity
  • Fits malls, hotels and parking areas

Drawbacks

  • Usage in the early years can be low in small towns
  • Software alone is ₹6 lakh in the report
  • Profit depends on getting cheap power
  • Charger standards and technology keep changing

Skills you need

  • Electrical safety and maintenance
  • Dealing with the DISCOM
  • Listing on charging apps and maps
  • Customer service

Why difficulty 3/5: Simple to run, but income depends on location and how fast EVs spread locally.

§3Market

Who buys

  • Electric car owners
  • Taxi and fleet operators

How it sells

  • Roadside or mall site
  • Charging apps and online maps

Good to know

  • The report expects India's charging-infrastructure market to grow over 40% a year (2019–2025) with government support.

§4Raw material & machinery

ItemQtyCost
AC charger 7.2–7.5 kW, Type-24₹2,60,000 (₹65,000 each)
DC charger 15 kW, GB/T1₹2,15,000
Charging software1₹6,00,000
GST at 18% on the above-₹1,93,500

From: PMEGP sample project report — EV Charging Station (prepared by Udyami/Samadhan)

  • Electricity45 kW load; ₹60,750 a month at full use and ₹4.5 a unit

From: PMEGP sample project report — EV Charging Station (prepared by Udyami/Samadhan)

§5Licences & registration

  1. Udyam registration
  2. GST registration
  3. Electricity connection from the DISCOM (ask for the EV charging tariff)
  4. Trademark for your brand name (optional)

We can do this registration for you

§6Schemes & subsidies

PMEGP fits (service projects up to ₹20 lakh); MUDRA gives loans up to ₹20 lakh; CGTMSE lets the bank lend without collateral.

§7Money

How the investment is worked out: Plant & machinery ₹12.69 lakh (chargers and software incl. GST), furniture & other assets ₹1.31 lakh, working capital ₹3.33 lakh = ₹17.33 lakh. Site rented.

Working capital: Working capital ₹3.33 lakh with a ₹3.00 lakh bank limit (25% of sales method).

Year not printed on the report — check current machinery prices.

How to prepare a loan file

§8Export potential

A local service business; it has no goods to export.

§9Risks — where people fail

  • Low vehicle traffic
  • Electricity tariff changes
  • Charger breakdowns
  • Big networks opening nearby

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working ev charging station unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (Udyam registration, GST registration), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start EV Charging Station?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. PMEGP sample project report — EV Charging Station (prepared by Udyami/Samadhan)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.