§1What this business is

Fabric is relaxed, spread, marked and cut, then printed or embroidered, stitched, checked, washed, pressed and packed. The sample report makes rompers for children aged 2 to 5, at 120 sets a day on a 10-hour shift. Garment making is labour-heavy and suits Indian conditions, according to the report.

Capacity: 120 sets a day on a 10-hour shift; the report runs at 40% in year 1.

§2Is it right for you?

Who it is for

Someone with tailoring or garment-trade experience and links to wholesalers or retailers.

Who it is not for

Someone with no design sense or market link — unsold stock piles up quickly.

Advantages

  • Low machinery cost (₹5.40 L)
  • Children's clothing is a steady, repeat purchase
  • Labour-heavy work that creates local jobs
  • Embroidery and printing in-house add value

Drawbacks

  • Thin margin in the report (3.7% in year 1)
  • Fashion and size trends change fast
  • Fabric price swings hit cost
  • Strong competition from large clusters

Skills you need

  • Pattern cutting and stitching
  • Embroidery and printing
  • Quality checking and sizing
  • Wholesale and online selling

Why difficulty 2/5: Simple machines and skills; margins are thin, so sales and design decide success.

§3Market

Who buys

  • Parents buying for children aged 2–5
  • Children's wear shops
  • Garment wholesalers

How it sells

  • Wholesale garment markets
  • Retail shops
  • Online marketplaces

Good to know

  • The report links rising demand for readymade clothes to urbanisation and fashion awareness.
  • It notes the textile and apparel sector is a major source of export earnings and jobs.

§4Raw material & machinery

ItemQtyCost
Cloth cutter1₹18,900
Stitching machinesnot printed₹26,000
Embroidery machine1₹2,20,000
Garment washing machine1₹66,300
Electric iron with table1₹8,800
Hand tools and equipment1 lot₹20,000
Fabric printing machine1₹1,80,000

From: PMEGP sample project report — Readymade Garments (prepared by Udyami/Samadhan)

  • Fabric (cotton, polyester)main raw material
  • Buttons, zips, stones, beads, interliningaccessories
  • Threadsfor stitching and embroidery

From: PMEGP sample project report — Readymade Garments (prepared by Udyami/Samadhan)

§5Licences & registration

  1. Udyam
  2. GST
  3. Trade licence from the local body
  4. Factory licence if the worker count needs it
  5. Trademark for the brand name

We can do this registration for you

§6Schemes & subsidies

The report was written for PMEGP; MUDRA Kishore or Tarun fits a loan of this size; CGTMSE covers collateral-free loans.

§7Money

How the investment is worked out: Samadhan report: plant & machinery ₹5.40 L + furniture ₹1.75 L + working capital ₹4.02 L = ₹11.17 L; premises own or rented (not costed).

Working capital: Working capital ₹3.62 L (all asked from the bank) for 10 days of fabric and finished stock and 15 days of buyer credit.

Year not printed on the sample report — check current machinery prices.

How to prepare a loan file

§8Export potential

Confirm the HS code in the DGFT ITC(HS) lookup before you export

6111.20Babies' garments and clothing accessories, knitted or crocheted, of cotton6209.20Babies' garments and clothing accessories, not knitted, of cotton

Export council / board: AEPC

  • Confirm the 8-digit ITC(HS) line with DGFT or your customs broker before shipping.
  • You need an Import Export Code (IEC) from DGFT before the first shipment.

§9Risks — where people fail

  • Unsold stock
  • Fabric price rises
  • Delayed payments from wholesalers
  • Copying of designs

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working readymade garments unit (baby rompers) unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (Udyam, GST), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start Readymade Garments Unit (Baby Rompers)?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. PMEGP sample project report — Readymade Garments (prepared by Udyami/Samadhan)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.