§1How big it is
India's installed power capacity reached 476 GW in June 2025: 240 GW thermal (50.52%; coal 219 GW, gas 20 GW), 110.9 GW solar, 51.3 GW wind; non-fossil 235.7 GW (49%) incl. 8.8 GW nuclear
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)Electricity generation grew from 1,168 BU in 2015-16 to an estimated 1,824 BU in 2024-25; energy shortage fell from 4.2% (2013-14) to 0.1% (2024-25)
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)Per capita electricity consumption rose 45.8% to 1,395 kWh in 2023-24 from 957 kWh in 2013-14
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)Coal production rose from 609.18 MT in 2014-15 to 1,047.68 MT in 2024-25
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)Hydro capacity rose from 35.8 GW to 48 GW (FY2014 to FY2025), targeting 55 GW by FY2030; nuclear capacity 8,780 MW across 25 NPCIL reactors in 2025
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)City Gas Distribution expanded from 53 to 307 geographical areas; PNG connections grew from 0.254 crore (2014) to 1.47 crore (2025)
PIB backgrounder: India's Energy Landscape - Powering Growth with Sustainable Energy (22 Jun 2025)
§2Ways to get started
- Electrical contracting (HT/LT line work, substations) for DISCOM tenders
- O&M services for substations and captive plants
- Biomass briquette/pellet plant supplying thermal plants and boilers
- Compressed biogas (CBG) plant - 150 projects / 1,211 TPD by Mar 2025 [PIB Jun 2025]
- Smart meter installation and meter-reading subcontracting
§3Hubs and clusters
- Coal belt: Jharkhand, Odisha, Chhattisgarh, MP (Singrauli) - well-known thermal and coal hubs
- Hydro: Himachal, Uttarakhand, J&K, Sikkim, Arunachal - well-known
§4Licences and registration
- Electrical contractor licence from the state licensing board (for wiring/line work)
- Generation, transmission or distribution licence under the Electricity Act 2003 - generation (except hydro above notified size) is de-licensed; distribution needs SERC licence
- CEA safety regulations compliance and Chief Electrical Inspector approval for HT installations
- Environment Clearance (EIA Notification 2006) for thermal plants above threshold
- PNGRB authorisation for city gas distribution areas
- Udyam Registration (MSME) - free, online, PAN + Aadhaar based
- GST registration (mandatory above turnover threshold or for inter-state supply / e-commerce sale)
- Shops & Establishment registration or Factory Licence (Factories Act / state rules) depending on size and power use
- Consent to Establish and Consent to Operate from the State Pollution Control Board - category (Red/Orange/Green/White) as per CPCB 2025 harmonised list; White category is exempt from consent
- IEC (Importer Exporter Code) from DGFT if you import or export
§5Regulators
- Ministry of Power; Central Electricity Authority (CEA)
- CERC (central) and State Electricity Regulatory Commissions (tariffs, licences)
- Ministry of Coal; Ministry of Petroleum & Natural Gas; PNGRB (city gas)
- State DISCOMs and Chief Electrical Inspector (electrical safety)
- MoEFCC / SPCB (environment clearance and consent)
§6Government help
- National Bioenergy Programme (2021-26, outlay Rs 1,715 crore): waste-to-energy, biomass briquette/pellet and biogas plants [PIB Jun 2025]
- Hydro: ISTS charge waivers and equity support for North East projects [PIB Jun 2025]
- RDSS (Revamped Distribution Sector Scheme) - smart metering and loss reduction works tendered by DISCOMs (status not checked in this pass)
- Cross-sector schemes that also apply (detailed in the programmes file): Udyam benefits, PMEGP, PM Mudra Yojana, CGTMSE credit guarantee, Stand-Up India, MSE-CDP (cluster development), RAMP, MSME ZED and Lean certification, MSME Champions, TReDS, Startup India (SISFS seed fund, Fund of Funds, CGSS), RoDTEP, EPCG, Advance Authorisation, Districts as Export Hubs, ODOP (One District One Product)
§7Pros and cons
Merits
- Demand keeps rising (generation up from 1,168 BU to 1,824 BU in a decade) [PIB Jun 2025]
- Steady government-driven tender pipeline for line, substation and metering works
Demerits
- Generation and distribution are capital-heavy and dominated by PSUs and large groups
- DISCOM payment delays affect contractors
- Heavy safety and environmental compliance