Cold Room (2 × 10 MT) for Fruit and Vegetables

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹21.4 lakh and ₹21.4 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Cold Room (2 × 10 MT) for Fruit and Vegetables

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹19.95 L
Term loan from bank
₹12.97 L
Promoter’s contribution
₹2.00 L
Subsidy
₹4.99 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.54 L
Average DSCR
-1.31
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Rent out space in two small 10-tonne cold rooms to farmers and traders near a mandi.

Main product or serviceCold Room (2 × 10 MT) for Fruit and Vegetables
Installed capacity per year (at 100%)10,000 units

04 Market

  • Vegetable and fruit farmers
  • Mandi traders and commission agents
  • Flower growers
  • Walk-in storage at the mandi
  • Seasonal contracts with traders and FPOs

05 Plant and machinery

ItemQty₹Total ₹
Cold room PUF panels, door, compressor, condensing unit, ceiling cooler and control panel (2 chambers) (× 1 lot)111,50,00011,50,000
Plastic crates and racks (× 1 lot)14,00,0004,00,000
DG set and electricals (× 1 lot)13,50,0003,50,000
Total19,00,000

Pre-filled from: PMEGP sample project report — Cold Room Project (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Electricity and diesel — power and fuel ₹3.00 L in year 1; the main running cost
  • Consumables and spares — ₹0.75 L in year 1

07 Cost of project

₹ in lakh
Plant and machinery19.00
Contingency0.95
Total fixed capital19.95
Working capital margin0.00
Total project cost19.95

08 Means of finance

₹ in lakh%
Promoter’s contribution2.0010.0
Subsidy4.9925.0
Term loan from bank12.9765.0
Total19.95100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.400.400.400.400.400.400.40
Insurance0.100.100.100.100.100.100.10
Total cost of operations3.383.383.383.383.383.383.38
Operating profit (EBITDA)-3.38-3.38-3.38-3.38-3.38-3.38-3.38
Depreciation2.992.542.161.841.561.331.13
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.401.221.000.780.560.340.12
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.77-7.14-6.54-5.99-5.50-5.04-4.63
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.77-7.14-6.54-5.99-5.50-5.04-4.63

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.77-7.14-6.54-5.99-5.50-5.04-4.63
Depreciation2.992.542.161.841.561.331.13
Cash accruals (PAT + depreciation)-4.78-4.59-4.38-4.16-3.94-3.72-3.50
Term loan repaid1.002.002.002.002.002.002.00
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.78-6.59-6.37-6.15-5.93-5.71-5.49
Cash and bank-5.78-12.37-18.74-24.89-30.82-36.53-42.03

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.986.986.986.986.986.986.98
Reserves and surplus-7.77-14.91-21.45-27.44-32.94-37.99-42.61
Term loan outstanding11.979.987.985.993.992.000.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities11.182.04-6.49-14.48-21.97-29.01-35.63
Net fixed assets16.9614.4112.2510.418.857.526.40
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.78-12.37-18.74-24.89-30.82-36.53-42.03
Total assets11.182.04-6.49-14.48-21.97-29.01-35.63

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.41-1.05-1.13-1.22-1.32-1.45-1.60
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.31
Lowest DSCR-1.60
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.992.542.161.841.561.331.13

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
112.971.401.0011.97
211.971.222.009.98
39.981.002.007.98
47.980.782.005.99
55.990.562.003.99
63.990.342.002.00
72.000.122.000.00

17 Licences and registrations

  • Udyam
  • GST (on storage rent, if applicable)
  • Electricity connection of the right load
  • Trade licence from the local body
  • FSSAI registration if you also trade or store food on your own account

18 Government schemes that may apply

  • Agriculture Infrastructure Fund (AIF)
  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Cold Room Project (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Cold_Room_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.