Building BusinessServices

Section 24

Cricket Bats

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹3.35 lakh and ₹19.82 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Cricket Bats

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹11.72 L
Term loan from bank
₹7.62 L
Promoter’s contribution
₹1.17 L
Subsidy
₹2.93 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.03 L
Average DSCR
-2.10
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Shape willow clefts into cricket and tennis-ball bats, fit cane handles, press, finish and pack.

Main product or serviceCricket Bats
Installed capacity per year (at 100%)10,000 units

04 Market

  • Cricket players, clubs and academies
  • Sports-goods shops across India
  • Export buyers
  • Marketing agents — most sales go through them (report)
  • Direct visits to city markets
  • Exporters

05 Plant and machinery

ItemQty₹Total ₹
Band saw machine (× 2)11,30,0001,30,000
Surface planer195,00095,000
Sand roller with dust-collecting duct195,00095,000
Bat press machine11,49,0001,49,000
Chook machine180,00080,000
Scoop wood design machine11,00,0001,00,000
Spray gun125,00025,000
Cutter with motor110,00010,000
Wood-working lathe with motor11,30,0001,30,000
Router with motor and accessories117,00017,000
Handle lathe machine140,00040,000
Motor with bearings and driving belts185,00085,000
Other equipment11,00,0001,00,000
KVIC unit: band saw, bat processing machine (3 HP), bat finishing machine (1 HP), wood lathe (1 HP), tools160,00060,000
Total11,16,000

Pre-filled from: KVIC Project Profile — Cricket Bats (PMEGP); PMEGP sample project report — Cricket Bat (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Kashmir willow clefts
  • Cane handles and handle thread
  • Grips, stickers and sandpaper
  • Varnish, thinner, polish and synthetic glue
  • Skin padding lamination, polythene packing and bat bags
  • KVIC unit: willow clefts, cane, other woods, twine, rubber grips, duco paint, hydrogen peroxide, linseed oil — ₹12,00,000 a year for raw material

07 Cost of project

₹ in lakh
Plant and machinery11.16
Contingency0.56
Total fixed capital11.72
Working capital margin0.00
Total project cost11.72

08 Means of finance

₹ in lakh%
Promoter’s contribution1.1710.0
Subsidy2.9325.0
Term loan from bank7.6265.0
Total11.72100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.230.230.230.230.230.230.23
Insurance0.060.060.060.060.060.060.06
Total cost of operations3.173.173.173.173.173.173.17
Operating profit (EBITDA)-3.17-3.17-3.17-3.17-3.17-3.17-3.17
Depreciation1.761.491.271.080.920.780.66
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.820.710.590.460.330.200.07
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-5.76-5.38-5.03-4.71-4.42-4.15-3.91
Income tax0.000.000.000.000.000.000.00
Profit after tax-5.76-5.38-5.03-4.71-4.42-4.15-3.91

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-5.76-5.38-5.03-4.71-4.42-4.15-3.91
Depreciation1.761.491.271.080.920.780.66
Cash accruals (PAT + depreciation)-4.00-3.89-3.76-3.63-3.50-3.37-3.24
Term loan repaid0.591.171.171.171.171.171.17
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.58-5.06-4.93-4.80-4.67-4.54-4.41
Cash and bank-4.58-9.64-14.57-19.37-24.05-28.59-33.00

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)4.104.104.104.104.104.104.10
Reserves and surplus-5.76-11.14-16.16-20.87-25.29-29.44-33.35
Term loan outstanding7.035.864.693.522.341.170.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities5.38-1.18-7.38-13.26-18.85-24.17-29.25
Net fixed assets9.968.477.206.125.204.423.76
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.58-9.64-14.57-19.37-24.05-28.59-33.00
Total assets5.38-1.18-7.38-13.26-18.85-24.17-29.25

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-2.25-1.68-1.81-1.95-2.12-2.32-2.56
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-2.10
Lowest DSCR-2.56
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.761.491.271.080.920.780.66

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
17.620.820.597.03
27.030.711.175.86
35.860.591.174.69
44.690.461.173.52
53.520.331.172.34
62.340.201.171.17
71.170.071.170.00

17 Licences and registrations

  • Udyam registration
  • GST
  • Trade licence from the local body
  • IEC (Import Export Code) for export

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. KVIC Project Profile — Cricket Bats (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/CRICKET_BATS_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf
  2. PMEGP sample project report — Cricket Bat (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Cricket_Bat_%28_Samadhan_Projects_%29.pdf
  3. World Customs Organization – HS Nomenclature 2022, Chapter 95 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/2095_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.