Motorcycle Chain Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹100.16 lakh and ₹100.16 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Motorcycle Chain Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹39.53 L
Term loan from bank
₹35.58 L
Promoter’s contribution
₹3.95 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-10.89 L
Average DSCR
-0.55
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Press, heat-treat and assemble roller chains for motorcycles on special-purpose machines.

Main product or serviceMotorcycle Chain Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Auto spare-parts wholesalers and retailers (replacement market)
  • Motorcycle makers (OEM supply)
  • Spare-parts dealer network
  • Supply contracts with vehicle makers

05 Plant and machinery

ItemQty₹Total ₹
Single-action power press, 75 tonne, with automatic feed (× 2)14,00,0004,00,000
Single-action power press, 50 tonne, with automatic feed11,50,0001,50,000
Single-action power press, 10 tonne140,00040,000
Special-purpose roller cup punching machine (× 2)11,30,0001,30,000
Special-purpose bush curling and cutting machine (× 2)12,60,0002,60,000
Special-purpose bush making and sizing machine (× 2)12,00,0002,00,000
Automatic header for rivet pins150,00050,000
Tumbling barrels (× 4)11,30,0001,30,000
30 kW electric rotary retort gas carburising furnace (× 2)17,50,0007,50,000
15 kW electric salt bath furnace (× 2)12,50,0002,50,000
Automatic chain block assembly machine (× 2)14,00,0004,00,000
Automatic chain assembly machine (× 2)13,80,0003,80,000
Hardness testing machine11,00,0001,00,000
Chain fatigue testing machine175,00075,000
Pollution control equipment12,50,0002,50,000
Universal milling machine with dividing head12,00,0002,00,000
Total37,65,000

Pre-filled from: DC-MSME project profile — Automotive Chain (Motorcycle Chain) (PMRY series, prepared by SISI); World Customs Organization – HS Nomenclature 2022, Chapter 73. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Medium carbon steel sheet, 19 SWG — 27 tonnes a month at ₹21,000 a tonne in the profile
  • CRCA DD-grade steel strip, 19 SWG — 8.2 tonnes a month at ₹20,000 a tonne
  • CR steel strip 11 mm × 1 mm with rounded edges — 5.5 tonnes a month at ₹30,000 a tonne (for bushes)
  • Low carbon steel wire, 4.5 mm — 8.5 tonnes a month at ₹30,000 a tonne (for pins)
  • Liquid carburising material and ammonia gas — 4,000 litres at ₹10 and 25 cylinders at ₹2,500 a month
  • Packing cartons — 30,000 a month at ₹0.70 each

07 Cost of project

₹ in lakh
Plant and machinery37.65
Contingency1.88
Total fixed capital39.53
Working capital margin0.00
Total project cost39.53

08 Means of finance

₹ in lakh%
Promoter’s contribution3.9510.0
Term loan from bank35.5890.0
Total39.53100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.790.790.790.790.790.790.79
Insurance0.200.200.200.200.200.200.20
Total cost of operations3.873.873.873.873.873.873.87
Operating profit (EBITDA)-3.87-3.87-3.87-3.87-3.87-3.87-3.87
Depreciation5.935.044.283.643.102.632.24
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.853.342.732.131.530.930.33
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-13.65-12.25-10.89-9.64-8.49-7.43-6.43
Income tax0.000.000.000.000.000.000.00
Profit after tax-13.65-12.25-10.89-9.64-8.49-7.43-6.43

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-13.65-12.25-10.89-9.64-8.49-7.43-6.43
Depreciation5.935.044.283.643.102.632.24
Cash accruals (PAT + depreciation)-7.72-7.21-6.60-6.00-5.40-4.80-4.19
Term loan repaid2.745.475.475.475.475.475.47
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-10.46-12.68-12.08-11.47-10.87-10.27-9.67
Cash and bank-10.46-23.13-35.21-46.69-57.56-67.83-77.50

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.953.953.953.953.953.953.95
Reserves and surplus-13.65-25.89-36.78-46.42-54.92-62.35-68.78
Term loan outstanding32.8427.3721.8916.4210.955.470.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities23.155.43-10.93-26.05-40.02-52.92-64.82
Net fixed assets33.6028.5624.2820.6417.5414.9112.67
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-10.46-23.13-35.21-46.69-57.56-67.83-77.50
Total assets23.155.43-10.93-26.05-40.02-52.92-64.82

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.59-0.44-0.47-0.51-0.55-0.60-0.67
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.55
Lowest DSCR-0.67
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation5.935.044.283.643.102.632.24

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
135.583.852.7432.84
232.843.345.4727.37
327.372.735.4721.89
421.892.135.4716.42
516.421.535.4710.95
610.950.935.475.47
75.470.335.470.00

17 Licences and registrations

  • Udyam registration
  • GST
  • State Pollution Control Board consent (the profile says permission is needed for heat treatment)
  • Factory licence
  • BIS certification only if a Quality Control Order covers your product — check the current BIS list

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. DC-MSME project profile — Automotive Chain (Motorcycle Chain) (PMRY series, prepared by SISI) — https://www.dcmsme.gov.in/publications/pmryprof/mechanical/ch3.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 73 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1573_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.