Detailed Project Report

Mushroom Cultivation & Processing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹49.35 L
Term loan from bank
₹32.08 L
Promoter’s contribution
₹4.94 L
Subsidy
₹12.34 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-11.93 L
Average DSCR
-0.65
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Button/oyster mushrooms in closed rooms — little land, crops all year.

Main product or serviceMushroom Cultivation & Processing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Star hotels and restaurants
  • Urban households
  • Tourist centres
  • Canning and drying units
  • Direct sale to retailers or consumers; wholesale distribution is mostly missing
  • Processed (canned and dried) mushroom trade, which is more organised

05 Plant and machinery

ItemQty₹Total ₹
Production unit equipment (200 tonnes a year model)130,00,00030,00,000
Compost and casing unit17,00,0007,00,000
Canning facilities, spawn lab and other equipment110,00,00010,00,000
Total47,00,000

Pre-filled from: UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Mushroom Cultivation & Processing; National Horticulture Board – Model Project Report: Button Mushroom. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Cereal straw (paddy or wheat) or sugarcane bagasse — main compost base; about 220 g dry material per 1 kg of mushroom
  • Fertiliser salts: urea, superphosphate, gypsum — added while making compost
  • Rice bran or wheat bran — compost supplement
  • Spawn (mushroom seed) — 0.5–0.75% of compost weight
  • Casing soil — garden loam and sand (4:1) or decomposed cow dung and loam (1:1), treated before use
  • Perforated polythene bags — for 250–500 g retail packs

07 Cost of project

₹ in lakh
Plant and machinery47.00
Contingency2.35
Total fixed capital49.35
Working capital margin0.00
Total project cost49.35

08 Means of finance

₹ in lakh%
Promoter’s contribution4.9410.0
Subsidy12.3425.0
Term loan from bank32.0865.0
Total49.35100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.990.990.990.990.990.990.99
Insurance0.250.250.250.250.250.250.25
Total cost of operations4.114.114.114.114.114.114.11
Operating profit (EBITDA)-4.11-4.11-4.11-4.11-4.11-4.11-4.11
Depreciation7.406.295.354.553.863.282.79
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.473.012.471.921.380.840.29
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-14.99-13.41-11.93-10.58-9.36-8.24-7.20
Income tax0.000.000.000.000.000.000.00
Profit after tax-14.99-13.41-11.93-10.58-9.36-8.24-7.20

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-14.99-13.41-11.93-10.58-9.36-8.24-7.20
Depreciation7.406.295.354.553.863.282.79
Cash accruals (PAT + depreciation)-7.59-7.12-6.58-6.04-5.49-4.95-4.41
Term loan repaid2.474.944.944.944.944.944.94
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-10.05-12.06-11.51-10.97-10.43-9.89-9.34
Cash and bank-10.05-22.11-33.62-44.60-55.02-64.91-74.25

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)17.2717.2717.2717.2717.2717.2717.27
Reserves and surplus-14.99-28.40-40.33-50.91-60.27-68.51-75.70
Term loan outstanding29.6124.6819.7414.819.874.940.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities31.8913.55-3.32-18.83-33.13-46.30-58.43
Net fixed assets41.9535.6630.3125.7621.9018.6115.82
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-10.05-22.11-33.62-44.60-55.02-64.91-74.25
Total assets31.8913.55-3.32-18.83-33.13-46.30-58.43

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.69-0.52-0.56-0.60-0.65-0.71-0.79
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.65
Lowest DSCR-0.79
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation7.406.295.354.553.863.282.79

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
132.083.472.4729.61
229.613.014.9424.68
324.682.474.9419.74
419.741.924.9414.81
514.811.384.949.87
69.870.844.944.94
74.940.294.940.00

17 Licences and registrations

  • Udyam
  • GST (on processing)
  • FSSAI (for selling packed/processed products)
  • Electricity connection (agri/commercial)

18 Government schemes that may apply

  • NHB Capital Investment Subsidy – Commercial Horticulture & Cold Storage (Scheme 1 and Cold Storage Scheme)
  • PM Formalisation of Micro Food Processing Enterprises (PM FME)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Prime Minister's Employment Generation Programme (PMEGP)
  • Agriculture Infrastructure Fund (AIF)

19 Sources

  1. UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Mushroom Cultivation & Processing — https://msme1connect.up.gov.in/Projectreport/Project%20Report638665945067973721.pdf
  2. National Horticulture Board – Model Project Report: Button Mushroom — https://nhb.gov.in/model-project-reports/Horticulture%20Crops%5CButton%20Mushroom%5CButton%20Mushroom1.htm
  3. FSSAI – Public Notice: List of mapped ITC HS codes with FSS Regulations — https://fssai.gov.in/upload/advisories/2020/03/5e6b37c994302Public_Notice_HS_Code_13_02_2020.pdf
  4. APEDA – Product groups (Cereals, Processed Foods, Animal Products, Fruits & Vegetables, Floriculture) — https://apeda.gov.in/

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.