Building BusinessServices

Section 24

PVC Packaging Bags

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹15.89 lakh and ₹15.89 lakh.

Legal form
Applicant category
Location

Detailed Project Report

PVC Packaging Bags

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹8.19 L
Term loan from bank
₹5.32 L
Promoter’s contribution
₹0.82 L
Subsidy
₹2.05 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.38 L
Average DSCR
-2.92
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cut, print, stitch and heat-seal PVC sheet into zipper, hanger, shopping and blanket bags.

Main product or servicePVC Packaging Bags
Installed capacity per year (at 100%)10,000 units

04 Market

  • Garment and saree makers
  • Bedding and blanket sellers
  • Gift and accessory makers
  • Shops needing branded carry bags
  • Direct orders from manufacturers
  • Packaging material wholesalers
  • Local market traders

05 Plant and machinery

ItemQty₹Total ₹
Cutting machine13,00,0003,00,000
Stitching machine (× 6)13,00,0003,00,000
Screen printer11,00,0001,00,000
Heat sealing machine150,00050,000
Other equipment and tools (× 1 lot)130,00030,000
Total7,80,000

Pre-filled from: PMEGP sample project report — PVC Bags (prepared by Udyami/Samadhan); DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • PVC rolls — main raw material; average raw-material cost ₹8 a bag in year 1
  • Zips, wire, handles and tape — as per bag design and size

07 Cost of project

₹ in lakh
Plant and machinery7.80
Contingency0.39
Total fixed capital8.19
Working capital margin0.00
Total project cost8.19

08 Means of finance

₹ in lakh%
Promoter’s contribution0.8210.0
Subsidy2.0525.0
Term loan from bank5.3265.0
Total8.19100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.160.160.160.160.160.160.16
Insurance0.040.040.040.040.040.040.04
Total cost of operations3.083.083.083.083.083.083.08
Operating profit (EBITDA)-3.08-3.08-3.08-3.08-3.08-3.08-3.08
Depreciation1.231.040.890.750.640.550.46
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.580.500.410.320.230.140.05
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.89-4.63-4.38-4.16-3.96-3.77-3.60
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.89-4.63-4.38-4.16-3.96-3.77-3.60

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.89-4.63-4.38-4.16-3.96-3.77-3.60
Depreciation1.231.040.890.750.640.550.46
Cash accruals (PAT + depreciation)-3.66-3.58-3.49-3.40-3.31-3.22-3.13
Term loan repaid0.410.820.820.820.820.820.82
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.07-4.40-4.31-4.22-4.13-4.04-3.95
Cash and bank-4.07-8.47-12.79-17.01-21.14-25.18-29.14

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.872.872.872.872.872.872.87
Reserves and surplus-4.89-9.52-13.90-18.06-22.01-25.78-29.38
Term loan outstanding4.914.103.282.461.640.820.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities2.89-2.56-7.76-12.73-17.51-22.10-26.51
Net fixed assets6.965.925.034.283.633.092.63
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.07-8.47-12.79-17.01-21.14-25.18-29.14
Total assets2.89-2.56-7.76-12.73-17.51-22.10-26.51

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-3.13-2.34-2.51-2.71-2.94-3.22-3.55
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-2.92
Lowest DSCR-3.55
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.231.040.890.750.640.550.46

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
15.320.580.414.91
24.910.500.824.10
34.100.410.823.28
43.280.320.822.46
52.460.230.821.64
61.640.140.820.82
70.820.050.820.00

17 Licences and registrations

  • Udyam
  • GST
  • Pollution control board consent
  • Registration as a plastic packaging producer under the Plastic Waste Management Rules where it applies
  • Trademark for the brand name

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — PVC Bags (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/PVC_Bags_%28_Samadhan_Projects_%29.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.