Yogurt (Dahi) Plant

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹36.79 lakh and ₹36.79 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Yogurt (Dahi) Plant

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹26.03 L
Term loan from bank
₹16.92 L
Promoter’s contribution
₹2.60 L
Subsidy
₹6.51 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-7.65 L
Average DSCR
-1.05
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Pasteurise milk, add culture and cup-pack yogurt for shops and supermarkets.

Main product or serviceYogurt (Dahi) Plant
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households
  • Hotels, restaurants and caterers
  • Sweet shops and institutions
  • Supermarkets and hypermarkets
  • Kirana and dairy shops
  • Direct supply to HoReCa buyers

05 Plant and machinery

ItemQty₹Total ₹
Batch pasteuriser, 300 L11,75,0001,75,000
SS pump, 500 lph130,00030,000
Offline cream separator with balance tank and SS pump11,50,0001,50,000
Milk homogeniser, 300 lph12,25,0002,25,000
Milk chiller, 600 lph175,00075,000
Cup sealing and filling machine11,50,0001,50,000
Cooling tower and water pump12,00,0002,00,000
SS and MS interconnecting pipeline11,25,0001,25,000
Air compressor and pipeline140,00040,000
Powder-coated electrical panel11,25,0001,25,000
Skid of rectangular SS pipes to mount the equipment150,00050,000
Incubation room heater system12,00,0002,00,000
Insulated cold room14,75,0004,75,000
GST at 18% on the above (sub-total ₹20,20,000) (× -)13,63,6003,63,600
Milk analyser (× 2)100
DPU (× 2)100
Stirrers (× 5)100
Electronic weighing scale, 100 kg (× 2)100
Lab and weighing equipment above, together (incl. GST) (× 1 lot)195,00095,000
Total24,78,600

Pre-filled from: PMEGP sample project report — Yogurt Plant (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022, Chapter 4. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Milk — 6,00,000 litres a year at full capacity; ₹38 per kg in year 1 rising to ₹40 in year 5
  • Starter culture — for fermentation
  • Cups and packing — ₹1.00 per kg in year 1 (₹3.00 L)

07 Cost of project

₹ in lakh
Plant and machinery24.79
Contingency1.24
Total fixed capital26.03
Working capital margin0.00
Total project cost26.03

08 Means of finance

₹ in lakh%
Promoter’s contribution2.6010.0
Subsidy6.5125.0
Term loan from bank16.9265.0
Total26.03100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.520.520.520.520.520.520.52
Insurance0.130.130.130.130.130.130.13
Total cost of operations3.533.533.533.533.533.533.53
Operating profit (EBITDA)-3.53-3.53-3.53-3.53-3.53-3.53-3.53
Depreciation3.903.322.822.402.041.731.47
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.831.591.301.010.730.440.16
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-9.27-8.44-7.65-6.94-6.30-5.70-5.16
Income tax0.000.000.000.000.000.000.00
Profit after tax-9.27-8.44-7.65-6.94-6.30-5.70-5.16

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-9.27-8.44-7.65-6.94-6.30-5.70-5.16
Depreciation3.903.322.822.402.041.731.47
Cash accruals (PAT + depreciation)-5.36-5.12-4.83-4.54-4.26-3.97-3.69
Term loan repaid1.302.602.602.602.602.602.60
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-6.66-7.72-7.43-7.15-6.86-6.57-6.29
Cash and bank-6.66-14.38-21.82-28.96-35.82-42.40-48.69

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)9.119.119.119.119.119.119.11
Reserves and surplus-9.27-17.70-25.35-32.29-38.59-44.29-49.45
Term loan outstanding15.6213.0110.417.815.212.600.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities15.464.42-5.83-15.38-24.28-32.58-40.34
Net fixed assets22.1218.8015.9813.5911.559.828.34
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-6.66-14.38-21.82-28.96-35.82-42.40-48.69
Total assets15.464.42-5.83-15.38-24.28-32.58-40.34

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.13-0.84-0.90-0.98-1.06-1.16-1.28
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.05
Lowest DSCR-1.28
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation3.903.322.822.402.041.731.47

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
116.921.831.3015.62
215.621.592.6013.01
313.011.302.6010.41
410.411.012.607.81
57.810.732.605.21
65.210.442.602.60
72.600.162.600.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent to establish and operate, where the state requires it
  • Trademark for your brand name (optional)
  • FSSAI licence for a dairy processing unit
  • Legal Metrology packaged-commodity registration for packed cups

18 Government schemes that may apply

  • PM Formalisation of Micro Food Processing Enterprises (PM FME)
  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Yogurt Plant (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Yogurt_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 4 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/0104_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.