§1What this business is

Rabri is a sweet made by boiling milk on low heat until it thickens and the cream layers are folded back in. In the report's unit, milk is received, pasteurised, chilled and stored, then cooked in two steam kettles with stirrers — sugar and ghee go into the first, dry fruits and crushed paneer into the second. The rabri is packed in 1 kg packets for sweet shops and retail.

§2Is it right for you?

Who it is for

Someone near a good milk supply who can sell to sweet shops, caterers and retailers.

Who it is not for

Someone without a cold chain or a sales route — unsold rabri goes bad in days.

Advantages

  • Rabri is eaten all over India, more so in UP and Bihar
  • Festival and wedding demand all year
  • Packed product reaches beyond one sweet shop
  • Uses local milk

Drawbacks

  • Thin margin in the first years
  • Milk spoils fast — needs a cold chain
  • Short shelf life of the product
  • Break-even at about half capacity

Skills you need

  • Milk testing and handling
  • Cooking control for even thickness
  • Hygiene and FSSAI rules
  • Selling to sweet shops and caterers

Why difficulty 3/5: Dairy hygiene, cold chain and thin early margins need close management.

§3Market

Who buys

  • Sweet shops and halwais
  • Caterers and wedding planners
  • Households through retail stores

How it sells

  • Direct supply to sweet shops
  • Dairy and grocery retailers
  • Caterers for weddings and festivals

Good to know

  • The report says milk sweets are consumed most in Uttar Pradesh and Bihar.
  • Demand runs through the year with festivals and religious occasions.

§4Raw material & machinery

ItemQtyCost
Milk pasteuriser1—
Dairy freezer1—
Milk reception system (suction pump, tanks, cooling)1—
Milk chiller1—
Milk storage tank (stainless steel)1—
Boiler1—
Cooking kettle with stirrer2—
Ribbon blender1—
Material handling equipment (water pumps, conveyors, weighing machine)1 lot—
All machinery together1 lot₹12.79 lakh (excluding GST and transport)

From: PMEGP sample project report — Rabri Making Unit (prepared by Udyami/Samadhan)

  • Milk₹35–40 a litre in the report
  • Sugar₹25–30 a kg
  • Dry fruits₹600–700 a kg
  • Ghee₹250–300 a kg
  • Crushed paneer₹180–200 a kg

From: PMEGP sample project report — Rabri Making Unit (prepared by Udyami/Samadhan)

§5Licences & registration

  1. FSSAI licence
  2. Udyam
  3. GST
  4. Pollution control board consent (dairy wash water and boiler)
  5. Boiler registration if the boiler size needs it

We can do this registration for you

§6Schemes & subsidies

The report was written for PMEGP; PMFME supports micro dairy-product units; MUDRA fits a loan of this size.

§7Money

How the investment is worked out: Samadhan report: plant & machinery ₹12.79 L + miscellaneous assets ₹1.50 L + working capital ₹3.65 L = ₹17.94 L; premises rented.

Working capital: Working capital ₹3.65 L (bank finance ₹3.28 L) — mostly money owed by buyers.

Year not printed on the sample report — check current machinery prices.

How to prepare a loan file

§8Export potential

Confirm the HS code in the DGFT ITC(HS) lookup before you export

2106.90Food preparations not elsewhere specified or included

Export council / board: APEDA

  • Fresh rabri has a short shelf life; export needs frozen or long-life packing.
  • Confirm the 8-digit ITC(HS) line with DGFT or your customs broker before shipping.
  • You need an Import Export Code (IEC) from DGFT before the first shipment.

§9Risks — where people fail

  • Milk price rises
  • Spoilage
  • Food-safety failures
  • Festival-linked swings in sales

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working rabri making unit unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (FSSAI licence, Udyam), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start Rabri Making Unit?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. PMEGP sample project report — Rabri Making Unit (prepared by Udyami/Samadhan)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.