§1What this business is

Bituminous coal is ground in ball mills, heated at 700–900°C without air in coke ovens for 7–8 hours, cooled, crushed to size and tested for strength, carbon, sulphur and ash. Foundries use the coke in cupolas to melt grey iron.

Capacity: 3 ovens of 800 kg coke a batch; annual cost of production ₹8.39 L at full use.

§2Is it right for you?

Who it is for

Someone in a coal belt near a foundry cluster who can meet strict pollution rules.

Who it is not for

Anyone near homes or without pollution-control expertise.

Advantages

  • Foundries need cupola coke regularly
  • Simple process
  • Tar can be collected as a by-product
  • Near coal belts, raw material is close

Drawbacks

  • Heavily polluting; pollution consent is hard to get
  • Very thin surplus at the profile's figures
  • Coking-coal supply is controlled and scarce
  • Hot, hazardous work

Skills you need

  • Coal grading and blending
  • Oven operation and safety
  • Coke quality testing
  • Selling to foundries

Why difficulty 5/5: Small investment but very hard to get pollution consent, and margins are thin.

§3Market

Who buys

  • Grey-iron foundries with cupolas
  • Small steel and casting units

How it sells

  • Direct supply to foundries
  • Coal and coke traders

Good to know

  • The profile notes cupola coke is of lower grade than blast-furnace coke.

§4Raw material & machinery

ItemQtyCost
Coke oven, 800 kg coke a batch3—
Coal crusher2—
Ball mill, 200 kg capacity3—
Material handling tools, testing lab, platform balance, office equipment——
Full equipment set—₹1,50,000

From: KVIC Project Profile — Bee - Metallurgical Coke (PMEGP)

  • Bituminous (coking) coal₹2,32,000 raw material a year in the profile; blends with non-coking coal are also used
  • Packing material₹15,000 a year

From: KVIC Project Profile — Bee - Metallurgical Coke (PMEGP)

§5Licences & registration

  1. Pollution control board consent to establish and operate (coke making is a red-category industry)
  2. Udyam
  3. GST
  4. Factory licence
  5. Coal purchase linkage or auction registration

We can do this registration for you

§6Schemes & subsidies

The KVIC profile is a PMEGP model; check with the bank and pollution board before applying.

§7Money

How the investment is worked out: KVIC profile: workshed 300 sq ft ₹60,000, equipment ₹1,50,000 (3 coke ovens of 800 kg a batch, 2 coal crushers, 3 ball mills of 200 kg, handling tools, testing lab, platform balance, office equipment), working capital ₹80,000 = ₹2,90,000.

Working capital: Working capital ₹80,000; requirement per cycle ₹1,39,967.

Year not printed on the KVIC profile — check current prices; equipment costs will be far higher now.

How to prepare a loan file

§8Export potential

Confirm the HS code in the DGFT ITC(HS) lookup before you export

2704Coke and semi-coke of coal

Export council / board: DGFT (IEC needed)

  • A small unit sells locally to foundries.

§9Risks — where people fail

  • Pollution-board closure
  • Coal supply cuts
  • Worker safety and burns
  • Low margin

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working metallurgical coke unit (small coke ovens) unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (Pollution control board consent to establish and operate (coke making is a red-category industry), Udyam), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start Metallurgical Coke Unit (Small Coke Ovens)?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. KVIC Project Profile — Bee - Metallurgical Coke (PMEGP)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.